Replacing windows or doors in South Florida requires a building permit and a final inspection in every county. The process is routine when a licensed contractor handles it, and it is the only way to get the closed permit your insurer and a future buyer will ask for. Here is what happens from application to closeout.

Why a permit is required

Windows and doors are part of the building envelope, and the Florida Building Code treats them as structural openings. A permit confirms that the products are approved for your wind zone, that the installation matches the approved drawings, and that an inspector has verified the work. Unpermitted window work can be flagged at sale, can void insurance coverage for storm damage, and can be ordered removed.

Step by step

Who pulls the permit

The licensed contractor doing the work pulls the permit under their license. Be cautious of any installer who asks you to pull an owner-builder permit, which shifts the liability to you and usually means the installer is not licensed for the work. Elevate Impact Windows is a Florida certified general contractor, license CGC1539231, and pulls every permit under that license.

What it costs and how long it takes

Permit fees are set by each municipality and are included in your quote from Elevate Impact Windows. The overall timeline from signed contract to final inspection is typically six to ten weeks, driven mostly by manufacturing lead time and plan review. We give you a schedule at the start and update you as the permit moves.

County notes

Read more: What is a Miami-Dade NOA? and how impact windows lower your insurance.

Frequently asked questions

Do I need a permit to replace windows in Florida?

Yes. Window and door replacement requires a building permit and a final inspection in every South Florida county.

Who is responsible for pulling the permit?

The licensed contractor performing the work. Elevate Impact Windows pulls every permit under license CGC1539231 and schedules the final inspection.

How long does a window permit take?

Plan review ranges from a few days to several weeks depending on the municipality. The full project, including manufacturing, typically runs six to ten weeks.

What happens if windows were installed without a permit?

The work can be flagged at sale, storm damage claims can be denied, and the building department can require the windows to be permitted after the fact or removed.

Do I need HOA approval too?

Often, yes. Many associations require approval of the product, color and style before the permit is issued. We provide the documents your HOA requests.