Installation day is the shortest part of an impact window project and the part homeowners worry about most. Here is how a typical day runs with Elevate Impact Windows, what to do beforehand, and what the house looks like when the crew leaves.

Before the crew arrives

A typical day

How long it takes

A typical single-family home with 10 to 20 openings takes one to three days. Sliding glass doors take longer per opening than windows. Second-story work, stucco repair and elevated homes in the Keys add time. We give you a schedule before the crew arrives and update you if anything changes.

After installation

The permit process, step by step and our warranty.

Frequently asked questions

Do I need to be home during installation?

An adult should be present at the start to walk through the openings and at the end for the final walkthrough. You do not need to stay all day.

Will my house be exposed overnight?

No. Each opening is removed and replaced the same day, and the crew does not open more openings than it can close before leaving.

Is there a lot of dust?

Some, in the rooms being worked on. Floors and furniture near each opening are covered, and each room is cleaned before the crew leaves.

What if the crew finds rot or damage in the opening?

The crew lead shows you the condition and explains the repair before proceeding. Minor repairs are common in older homes.

When can I open the new windows?

After the first day, once the sealant has cured.